Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Wembley Olympic Way, London – Stepping up to the challenge: Wade products installed at the iconic Olympic Steps in Wembley

Under the feet of Olympians

As part of a major transformation of Wembley Park, which includes Olympic Way, Wade Stainless Steel Linear Channels and Streamline, and perforated gratings were installed beneath the Olympic Steps to provide an effective and long-lasting drainage solution.

Built by developer Quintain in a joint project with Brent Council, the Olympic Steps come at the end of Olympic Way—the stretch of road linking Wembley underground station to Wembley Stadium. It was named Olympic Way after it was originally constructed for the 1948 London Olympics.     

The final stages of this redevelopment were the iconic steps that lead up to the national stadium. The original ramp, known as the pedway, was built as part of the old Wembley Stadium and acted as a bridge over the old coach parks. The Olympic Steps development replaced the outdated, concrete pedway and extended the Olympic Way, increasing the width by 50% and improving accessibility for all visitors in and around Wembley Park. Volker Fitzpatrick was the main contractor on the project.

Wade Stainless Steel Channels are available in a range of profiles, generally with in-built fall towards the outlets. Side bars and folds are made so that the selected grating fits flush with the show edges. A Narrow edge (NE) Linear Channel was specified and installed for this project. These channels are suitable for most standard applications and can be produced as a curved channel with any perforated gratings.

The Challenges and solutions

Learn more about Wade, and see how their products can benefit your project here: https://www.alumascwms.co.uk/products/wade/

Wade Stainless Steel Linear Channels

Explore the full Wade range here

Connect With Wade